A2O awarded Works Partner of the Year
A2O Facades is honoured to be recognised as Willmott Dixon’s London & East Works Partner of the Year 2025!
Brighton Met Project Explainer launch

Portal design inspiration, Retrofit rationale and multi Logistics solutions:
the project team take us behind the scenes in a series of short videos…
Sutton’s Wharf completed

A 7-storey, curved apartment block reclad in render, Cedral Lap plank and zinc standing seam.
A2O Facades: SCSS Gold Membership

A2O is now a Gold Member of the Supply Chain Sustainability School.
Closing the Loop on Aluminium Recycling

A2O now installs sub grids in Hydro LEC Recycle Grade 4.0 aluminium. This reduces carbon emissions by 40%+ in new builds and up to 93%+ in reclads where aluminium can be recycled.
Come & Visit Us, London Build Expo, Olympia, 15-16 Nov

Come and speak to us about Facade Remediation at Stand F88
Building Awards 2023 – A²O shortlisted

A²O has been shortlisted for Specialist Contractor of the Year at the Building Awards 2023
Double-win at Façade Awards UK 2022!

Greatly honoured to win Best Use of a Brickslip clad system with Thurrock Civic Centre and a Timber clad system with Grange Paddocks Leisure!!!
Winchester Sports Park open for business

The £37m Winchester Sports & Leisure Park opened on 29th May and the façades look stunning.
Product Award Winner: Willmott Dixon Powered by the Best

A2O are Product Award Winners at the Willmott Dixon London & South’s ‘Powered by the Best’ Conference & Awards 2020 for industry partners.